top of page
Search

What is a RAMS? A Complete Guide for UK Tradespeople

If you work in the UK construction or trades industry, you've almost certainly come across the term RAMS. But what exactly does it mean, and why is it so important?


RAMS Stands for Risk Assessment and Method Statement

A RAMS is a document that combines two critical health and safety documents:

  1. Risk Assessment — identifies potential hazards associated with a job and evaluates the level of risk

  2. Method Statement — outlines the step-by-step process for completing the work safely

Together, these documents form a comprehensive safety plan that protects workers, clients, and the public.


Why Do You Need a RAMS?

Under UK law, specifically the Health and Safety at Work Act 1974 and the Construction (Design and Management) Regulations 2015 (CDM 2015), employers and contractors have a legal duty to assess risks and plan work safely.

A RAMS helps you:

  • Comply with the law — demonstrate that you've identified hazards and planned safe working methods

  • Protect your workers — ensure everyone on site knows the risks and how to manage them

  • Win more contracts — many clients and principal contractors require RAMS before you can start work

  • Reduce incidents — proper planning leads to fewer accidents and near-misses


What Should a RAMS Include?

A good RAMS typically covers:

Risk Assessment Section

  • Description of the work activity

  • Identified hazards (falls, electrical, manual handling, etc.)

  • Who might be harmed and how

  • Existing control measures

  • Risk rating (likelihood × severity)

  • Additional control measures needed


Method Statement Section

  • Scope of works

  • Sequence of operations

  • Plant and equipment to be used

  • Personal Protective Equipment (PPE) requirements

  • Emergency procedures

  • Competency requirements

  • Welfare arrangements


Common Mistakes with RAMS

Many tradespeople make these errors:

  • Copying old templates without updating for the specific job

  • Being too generic — a RAMS should be tailored to each project

  • Not reviewing regularly — conditions change, and your RAMS should too

  • Rushing the process — a poorly written RAMS is worse than none at all


How to Create RAMS Quickly and Professionally

With Safe Trade Solutions, you can generate fully compliant, bespoke RAMS in minutes. Simply enter your job details, and our AI creates a professional document tailored to your specific project.

Ready to save hours on your RAMS? Start your free 14-day trial — no credit card required.

 
 
 

Comments


bottom of page